Quality Reviews
AEI has provided quality assurance reviews of the stage construction and maintaining traffic plans prepared by others to ensure completeness and accuracy, and to check for conformity with MDOT/industry standards and practices. During our reviews, we draw from our experience on similar past projects to identify potential issues and recommend remedial measures.
I-75 Modernization Project (Segments 1, 2 & 3) in Oakland County, Michigan
- AEI assisted WSP, as part of the Michigan Department of Transportation’s Owner’s Representative Team, in the procurement process for the 2016 Design-Build of I-75 from Coolidge Highway to South Boulevard (Segment 1), the 2018 Design-Build of I-75 from 13 Mile Road to Coolidge Highway (Segment 2), and the 2018 Design-Build-Finance-Maintain of I-75 from 8 Mile Road to 13 Mile Road (Segment 3). Combined, the projects include reconstruction of 17.7 miles of roadway and 11 interchanges, and bridge replacement/removal/rehabilitation of 54 structures. AEI prepared the concepts for maintaining traffic on each project and provided quality assurance reviews of the traffic plan submittals by the Contractor for each segment.
- Owner: Michigan Department of Transportation
- Client: WSP Michigan, Inc.
- Construction Cost: ~$88.7 million (Segment 1), ~$233 million (Segment 2), Segment 3 unknown.
- Construction: 2014 - Present
M-59 from Romeo Plank Road to I-94, Macomb County, Michigan
- Project included reconstruction of the existing pavement, curb and gutter, and median crossovers, construction of paved median shoulders, drainage replacement, signal modernization, signing and pavement markings. Also included is CPM work on 7 bridges. AEI developed the maintaining traffic concepts and was responsible for providing a quality assurance review of the maintaining traffic plans developed by the Prime Vendor.
- Owner: Michigan Department of Transportation
- Client: AECOM Great Lakes, Inc.
- Construction Cost: ~ $61.2 million
- Construction: 2021
I-75 from the Ohio State Line to Erie Road, Monroe County, Michigan
- Project included the concrete reconstruction of 5 miles of I-75 with drainage and geometric improvements, and replacement of seven bridges. AEI developed the maintaining traffic concepts and final pavement marking plans and was responsible for providing a quality assurance review of the maintaining traffic plans developed by the Prime Vendor. Maintaining two lanes in each direction of I-75 at all times directly at the state line, while keeping the temporary crossovers within the state of Michigan, required creative staging.
- Owner: Michigan Department of Transportation
- Client: AECOM Great Lakes, Inc.
- Construction Cost: ~ $117.1 million
- Construction: 2019